Green Hydrogen Plants: Tackling Operational Challenges

25 February 2026
2:00 PM GMT (UK) | 8:00 am CST (Houston)
45 Minutes

Explore operational challenges of green hydrogen plants and learn how KBC’s digital tools (VM-EMS, Petro-SIM) can help optimize production, certification, and system integration.

Webinar Overview:

Green hydrogen produced via renewable-powered electrolysis is a pillar of the energy transition, but scaling it from lab to industrial scale introduces complex operational, integration, and certification challenges.

In this webinar, Nicolas Carrara, Technical Presales Consultant at KBC, will dive into the real-world obstacles facing green H₂ deployment and how advanced digital tools like VM-EMS and Petro-SIM can help. You’ll discover how to manage dynamic systems, ensure auditability, and optimize reliability in production.

You’ll learn how to:

  • Handle real-time and multi-period optimization for hydrogen assets
  • Integrate variable renewable energy with electrolysers and existing utility systems
  • Monitor and report carbon footprints with auditability and certification in mind
  • Bridge digital systems for certification, interoperability, and data integrity
  • Incorporate case study insights and best practices for scaling hydrogen operations

Whether you’re designing new plants or enhancing existing ones, this session gives you practical tools and strategies to tackle operational challenges in green hydrogen deployment.