The results
KBC demonstrated that wax deposits, while a definite risk, were manageable for the pipeline in questions. Specifically, KBC showed that precipitated wax was up to 100 times lower than had been previously predicted and a pigging frequency of between 6 and 14 days was required, which was compatible with the profitability of the plant.