Avoidance of drilling inefficiencies and errors

KBC was engaged to scope and complete integration of real-time and near real-time data against well assets by a major independent exploration and production company to improve the cost and reduce the duration of their drilling operations by avoiding expensive inefficiencies and mistakes.

The challenge

Data required to solve the problems this customer faced were in various systems and of differing types. Communications barriers within the customer organization had resulted in no viable solution being developed. The customer had recently declared their PI System as the system of record for real-time data and the platform upon which such applications should be built.

Solution

KBC integrated multiple sources of real-time and near real-time data into the site PI System bringing together OT and IT information into an asset based data model. This model then allowed triggering of alarms for issues such as:

  • High pressures
  • Overpull
  • Fluid loss
  • Washouts

Many of KBC’s off-the-shelf PI components were utilized to solve the customer’s issues. KBC worked as a partner alongside the customer interacting with their engineering, IT, and management departments bridging communication barriers between the groups for optimal results. Analytics, visualizations, and automation of new assets were all key components of this project’s success.

The results

The customer was able to reduce average drilling time by days and in some cases weeks as a result of the increased real-time monitoring. The alarming setup reduced equipment damage thereby reducing delays in production and cost overall. The level of accuracy while drilling was improved resulting in less “zig zag” and better production results. All in all this project has brought a reduction in cost and drilling duration to the production field.

Share this

Get in touch with us

Do you have a project you're interested in
working with us on?

You may also be interested in

WHITEPAPER

Key steps for delivering autonomous operations

Feb 4, 2020

Achieving autonomous operations is all about empowering the plant to run, learn, adapt and thrive in tomorrow’s environment. Dynamic real-time optimization gives a fast automated response based on the actual changes in raw material properties, product demand, and operating conditions.

Read full article
NEWS

KBC and OLI Systems announce predictive software solution to mitigate USD 65 billion/year corrosion and scaling problems across the oil and gas industry

Jun 3, 2020

Petro-SIM® and the OLI Alliance Engine digital twin mitigates operational risk, increases efficiency, and prevents revenue loss.

Read full article
BLOG

The right decisions in abnormal situations

May 13, 2020

Sanjay Bhargava, Principal Consultant

Do you have an accurate representation of your plant to drive the right decisions in your organization at this critical time?

Read full article

Get the latest updates from KBC

Sign up to our newsletter to receive our latest innovations, viewpoints and be informed about any upcoming events.